I am wondering whether the foundations laid for C5 were engineered much higher than required. This would allow them to be used for future testing of a variety of wave energy devices?
I would like to think that CWE will planning for the future in all the decisions they make.
CWE Price at posting:
3.6¢ Sentiment: Hold Disclosure: Held