Further to my last post, i dont think their finished product relies soley on their processing plants and their settings i think you said. I would expect they would need to have the right blends of different grades of ore particularly for this 'specialized product'. Surely they wouldnt call it specialized if the only thing special about it is the general area it was dug up in. If this is the case they would definitely need to do some drilling to map out where the different grades are. As usual could be wrong not really sure about this one
- Forums
- ASX - By Stock
- ELE
- Ann: Appointment of Lead Design Engineers
Ann: Appointment of Lead Design Engineers, page-25
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable