88E 0.00% 0.2¢ 88 energy limited

Ann: Permeability Exceeds Pre-Drill Expectations, page-103

  1. 5,998 Posts.
    lightbulb Created with Sketch. 525
    Check out the investor presentation prior to the Drilling starting has the following Porosity based on ALCOR#1 core samples;

    Column 1 Column 2 Column 3 Column 4
    0 HRZ Matrix Porosity adjusted for Kerogen Related Porosity      
    1 Depth TOC (Wt%) Matrix Porosity Kerogen - modified porosity
    2 8643 2.078 13.2 18.4
    3 8654 2.445 9.6 16.0
    4 8664 2.323 11.4 17.3


    http://www.asx.com.au/asxpdf/20150914/pdf/43193xrxkbb64h.pdf
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.