I'm only expecting drill results for 12R and 13R plus other updates in the next ANN. However I don't think the diamond drilling results 1D 2D or 3D for the intersections of existing bores and the inferred electromagnetic conductor under 200m will be ready yet. These I hope will be available in time for the 20th April Presentation.
Add to My Watchlist
What is My Watchlist?