Gerber ... you're a sharpshooter
always have been
always will be.
Listen up.
The stuff up with the northern field has been ...
Inaccurate placement of the perforations in the casings depth-wise. Here's how ...
The WPL Geo, (after reading the wire-logs), has to map the net producing sand over the gross column.
The WPL Pet/Eng (after reading the maps), has to call for the correct perforation (depth and size) of the casing at those depths.
Then the WPL Drill/Eng has the responsibility to place the sand packs at the optimal positions to capture max flow.
Either the Geo stuffed up ...
or the Pet?Eng stuffed up ...
or the Drill/Eng stuffed up ...
or the Wire-Log gear was faulty.
or better still ... the stars just didn't get it together.
Bad luck Yogi ... you almost had me believing.
Anyways, here's some SG logic.
HDL is bottom pickin' stuff now.
The oil is there, always will be, and Mr Hardman is going to get it.
Northern wells will be re-drilled after analysis of the 4D stuff with correct oil interception levels.
SG asks this question (4D) ... what is the 4th dimension?
- Forums
- ASX - By Stock
- HDR
- next report.
HDR
hardman resources limited
next report., page-4
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
RNU
Renascor wins a funding boost given it wants to produce a critical mineral – but $5M award pales in comparison to some