EUR 2.70% 3.6¢ european lithium limited

Ann: Acquisition of Advanced Lithium Project with Resource-PNE.AX, page-33

  1. 5,657 Posts.
    lightbulb Created with Sketch. 4
    To list a company you need a full pr0pectus. This is very detailed and you can not get away with the vaguness like you have mentioned on the resource in you post.
    Inferred means jack!
    Note the date of the Jorc. 2004. Quite telling right there.

    All the players and what they get are getting is disclosed. There is no hiding anything

    If you back door list through a run down shell company. ASX only requires a reduced disclosure prospectus.
    You can be nice and vague. This you have already picked up on.

    These guys specialise in these types of listings.
    The vendors make their money.
    Brokers make their money.
    The SI's who get cheap share get a nice 20% 30% as there is always free options and sweeteners attach. Ramp on HC
    The director get there salarys and consulting fees.
    Facilitaters get their % for setting it all up.
    And the ramping begins. Tip sheets. Brokers report who have shares. Etc etc

    Does anything have to be produced??
    Drilling. Plants. Jorc. In the coming days, weeks, months.

    Have a look at the history of IGS
    Gold mines never mined.
    Handed back for nothing. Auditor could not get any information
    Rinse and repeat with medical pot.
    Guess what. That never happened either

    Read up about Tony Sages mate.
    Frank Timis.

    BMZ Brewer
    Silver mine. Never happened
    Treasure hurt on a WW1 wreck. I kid you not!
    Now some failed mine from Gulf resources from 2010

    Rinse and repeat


    Jorc in 2004???
    What a cracker it must be!
 
watchlist Created with Sketch. Add EUR (ASX) to my watchlist
(20min delay)
Last
3.6¢
Change
-0.001(2.70%)
Mkt cap ! $50.33M
Open High Low Value Volume
3.6¢ 3.7¢ 3.5¢ $11.46K 318.1K

Buyers (Bids)

No. Vol. Price($)
1 152466 3.6¢
 

Sellers (Offers)

Price($) Vol. No.
3.7¢ 210561 2
View Market Depth
Last trade - 16.10pm 22/08/2024 (20 minute delay) ?
EUR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.