Example: GA Demonstration Project in China • Project name: Phase I, EFG Panyu Industrial Park Limited; • Project size: 100kw roof top grid-connected solar energy system; • Daily Electricity Production; 253kwh/day; • Est. Greenhouse CO2 Saving: 243 ton/year; • Project leasing period: 10 years • Project funding: A$ 350k fully funded by GRI; • Project Leased at 16% P.A; • Fixed Amortization a$598/month. • An opportunity to be expanded to a 2 MW MSPP on Phase II.
- Forums
- ASX - By Stock
- AFT
- What The!!
What The!!, page-14
-
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
KAI
Pilbara Minerals buys land off Kairos part of its York gold project for $20M – and a 2% royalty on any PLS gold sales
AVH
Avita boosts skin restoration product portfolio with 'dermal matrix' – a kind of next-level gauze made of fake skin
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
Add AFT (ASX) to my watchlist
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.020M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AFT (ASX) Chart |
Day chart unavailable