yeah look I dont disagree, I dont think the numbers are erratic at all, in fact in terms of gold distribution the numbers actually show low variance. The structures can be dealt with in a resource and will be eventually resolved with grade control drilling no problem. Indicated and inferred on 50m spacing no problem.
BUT there is a difference between 4-8 MOZ and 1.5-2.5 MOZ
One is a very good result and worth multiples of the current value, the other is probably worth over 750 million and we should all be selling our house to buy more stock- send more money now.
Youga is over the border so forget about that for a start as well.
The numbers look like they will support a plant, so it will always be more attractive option than selling ore to the Chinese plant as well.
When the truth is good, why not stick with the truth, just an idea to throw out there.
- Forums
- ASX - By Stock
- CDV
- Conceptual target upgrade 4.8M-8.3M ozs. gold
Conceptual target upgrade 4.8M-8.3M ozs. gold, page-151
-
- There are more pages in this discussion • 39 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CDV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online