You are correct Hank.
They have yet to have a completed fabricated chip with all end-to-end components installed. From memory, the final version of the ASIC (Application Specific Integrated Circuit) component was being held up by the fabrication manufacturer's scheduling, but was due in the next month or two.
- Forums
- ASX - By Stock
- AKP
- Next trigger
Next trigger, page-3
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
MTL
Mantle Minerals' Nick Poll talks to HotCopper on finding gold grades up to 3.57g/t at Mt Berghaus
STX
Strike hands $48.5M contract to Clarke Energy to produce 20x 4.5MW gas engines for Sth Erregulla
Add AKP (ASX) to my watchlist
|
|||||
Last
$6.20 |
Change
0.000(0.00%) |
Mkt cap ! $181.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AKP (ASX) Chart |
Day chart unavailable