HDR hardman resources limited

good progress, page-2

  1. 485 Posts.
    lightbulb Created with Sketch. 2
    Comparing drill progress at Flamant with Pelican it looks like Flamant was drilled at twice the rate.

    Pelican 12 1/4 inch hole....469m in around 5 days

    Flamant 12 1/4 inch hole....1265m in around 7 days

    Hopefully this "easy" drilling through the target zone is a positive indicator for good quality sands?
 
watchlist Created with Sketch. Add HDR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.