M4M 3.13% 3.1¢ macro metals limited

Ann: Feasibility Study-KFE.AX, page-6

  1. 132 Posts.
    lightbulb Created with Sketch. 49
    "The plan is for mining operations to be initially conducted on a 12 hour shift, 350 days of the year, with no production drilling or blasting required due to the soft, friable material. Kogi is expecting this would be essentially a ‘free dig’ operation."

    So a very low cost operation !! combine this with low cost labour and transport costs !!
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
-0.001(3.13%)
Mkt cap ! $111.5M
Open High Low Value Volume
3.1¢ 3.3¢ 3.1¢ $225.3K 7.101M

Buyers (Bids)

No. Vol. Price($)
3 543047 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 788523 5
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.