M4M 2.63% 3.7¢ macro metals limited

Ann: Feasibility Study-KFE.AX, page-6

  1. 132 Posts.
    lightbulb Created with Sketch. 49
    "The plan is for mining operations to be initially conducted on a 12 hour shift, 350 days of the year, with no production drilling or blasting required due to the soft, friable material. Kogi is expecting this would be essentially a ‘free dig’ operation."

    So a very low cost operation !! combine this with low cost labour and transport costs !!
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
3.7¢
Change
-0.001(2.63%)
Mkt cap ! $133.1M
Open High Low Value Volume
3.9¢ 4.0¢ 3.7¢ $66.57K 1.738M

Buyers (Bids)

No. Vol. Price($)
9 1810633 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 313649 1
View Market Depth
Last trade - 16.10pm 02/07/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.