VPR 0.00% 0.2¢ volt group limited

Any day now. Blast off!, page-137

  1. 629 Posts.
    lightbulb Created with Sketch. 1
    In the same way as NST I would think, plus the return for the second project is much higher being a 6 x ATEN 4 9.6 MW install.

    From these 2 installs alone you would be looking at return of approximately 8 - 10 mill a year.

    Also once the first is up and running government grants, bank loans, green funding grants and so on.

    Every company starts out with dept, it's having a product that works and delivers that is the key.

    That is the potential ECM can see and why they are / will be on board.

    Cheers

    Rayza
    Last edited by rayza71: 26/07/16
 
watchlist Created with Sketch. Add VPR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.