CWE carnegie wave energy limited

Foundations, page-6

  1. 813 Posts.
    lightbulb Created with Sketch. 32
    Didn't read the transcript..

    Cubic root of 120/2.4 gives 3.68
    120 load
    2.4t/m3 (concrete density excluding rebar)

    So a gravity footing 4x4x4m would stop the ceto6 from moving away. You would assume that the 120 is the peak load or design load after safety factors have been factored in.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.