great day on EKA. must be almost at the hosston target by now....
After the 7 5/8 inch casing has been run and set, drilling will resume towards and into the
primary Hosston Formation target, which is expected to be reached within a few days. Based
on seismic data and an offset well the Hosston Formation is anticipated to consist of more than
4000 feet (1,220 metres) of inter-bedded sandstones and shales with the potential for multiple
prospective intervals.
Add to My Watchlist
What is My Watchlist?