The one thing I can't really understand, is why they are running the wirelines now.
It takes ages to pull out of the hole & go back in again, esp at this depth.
One would normally do it at the end of drilling, or during a bit change. I can only assume that they are doing a bit change.
I think adi's are doing a bit change at sugarloaf, & the two drillings seem to be at the same stage now. They were both running casings at about the same time.
Good luck to holders, & nice bounce this am
GDN Price at posting:
0.0¢ Sentiment: Buy Disclosure: Not Held