-
Share
14/11/06
03:35
Share
re: eme up12 per cent nc
These have just been posted on Advfn.
I am working so no time to check anything yet.
SORRY FOR THE LONG POST!
TEXAS CRUDE
KARNES CO. TEXAS DAILY WELLSITE REPORT
SUGARLOAF #1 V1994A
REPORT FOR MR. R. BRIDGES / MR. D. O'BRIEN
DATE Nov 10, 2006 DEPTH 18624 PRESENT OPERATION DRILLING AHEAD
TIME 06:00 HRS. YESTERDAY 18476
24 HOUR FOOTAGE 148
CASING INFORMATION 7 5/8" SET TO17000'
SURVEY DATA
DEPTH INCLINATION AZIMUTH VERTICAL DEPTH
BIT INFORMATION INTERVAL CONDITION REASON
NO. SIZE TYPE S/N JETS IN OUT FOOTAGE HOURS T/B/C PULLED
13 6.5 STC JW6602 TFA=.178 18177'
DRILLING PARAMETERS HIGH LOW AVERAGE CURRENT AVG
RATE OF PENETRATION 17.1 @ 18512.00000 3.6 @ 18543.00000 9.8 12.14083 FT/HR
SURFACE TORQUE 220 @ 18499.00000 198 @ 18541.00000 210.2 212.99315 AMPS
WEIGHT ON BIT 9 @ 18506.00000 0 @ 18577.00000 7.0 6.20624 KLBS
ROTARY RPM 58 @ 18569.00000 54 @ 18499.00000 56.9 55.68628 RPM
PUMP PRESSURE 3629 @ 18499.00000 3312 @ 18543.00000 3533.9 3522.22583 PSI
DRILLING MUD REPORT DEPTH
MW VIS PV YP FL Gels CL-
FC SOL SD OIL MBL pH Ca+ CCI
MWD SUMMARY
INTERVAL TO
TOOLS
GAS SUMMARY (units) HIGH LOW AVERAGE
DITCH GAS 316 @ 18529.00000 73 @ 18543.00000 193.0 TRIP GAS N/A
CUTTING GAS 0 @ 18595.00000 0 @ 18595.00000 0.0 WIPER GAS N/A
CHROMATOGRAPHY (ppm) SURVEY 316
METHANE (C-1) 60360 @ 18529.00000 14249 @ 18543.00000 32810.0 CONNECTION GAS HIGH 0
ETHANE (C-2) 3203 @ 18580.00000 705 @ 18509.00000 1567.8 AVG 0
PROPANE (C-3) 396 @ 18529.00000 95 @ 18543.00000 214.8 CURRENT 0
BUTANE (C-4) 0 @ 18595.00000 0 @ 18595.00000 0.0 CURRENT BACKGROUND/AVG 260 / 193
PENTANE (C-5) 0 @ 18595.00000 0 @ 18595.00000 0.0
HYDROCARBON SHOWS SEE SHOW REPORT No. 7
INTERVAL LITHOLOGY/REMARKS GAS DESCRIPTION
LITHOLOGY
PRESENT LITHOLOGY 40% SANDSTONE 60% SHALE
DAILY ACTIVITY SUMMARY DRILL AHEAD - TAKE WIRELINE SURVEY -DRILL AHEAD
EPOCH PERSONNEL ON BOARD 2 DAILY COST
REPORT BY Mike Teas
2.
TO: 11/09/2006
SHOW SUMMARY FROM: 10/18/2006
WELL NAME / JOB#: SUGARLOAF #1 WELL API NO:
OPERATOR: TEXAS CRUDE ENERGY, INC. STATE:TEXAS
CONTRACTOR: PATTERSON DRILLING RIG #30 COUNTY: KARNES COUNTY
PROJECTED DEPTH: 21000 FIELD: PROSPECT V-1994
SPUD DATE: 11/07/06 DIVISION: GULF COAST INLAND
SHOW REPORT NO. 7
COMPANY: TEXAS CRUDE
WELL# SUGARLOAF #1
KARNES CO.
LOCATION TEXAS
DEPTH INTERVAL: 18440 TO 18480 (MD) TOTAL FTG: 40
TO (TVD)
BIT INFORMATION: BIT TYPE-STC WITH TURBINE BIT HOURS-N/A
AVERAGES:
BEFORE
DURING
AFTER
MAXIMUM
ROP (fph) 6 11.2 7 20.7
WOB 8 5 6 8
RPM 57 54 57 57
MUD WT 14.9 14.8 (CUT) 14.9 14.9
CHLORIDE N/A N/A N/A N/A
TOTAL GAS 81 254 153 326
C1 (ppm) 16220 50923 30730 64306
C2 (ppm) 531 1970 1087 2619
C3 (ppm) 107 309 186 392
C4 (ppm) TR TR 0 TR
C5 (ppm) 0 0 0 0
CUTTINGS FLUORESCENCE%: NONE COLOR: N/A
INTENSITY: N/A CUT:
FORMATION DESCRIPTION:
SANDSTONE = OFF WHITE AND PALE WHITE TO CLEAR; TRANSLUCENT TO FROSTED;
SILTY TO LOWER VERY FINE GRAIN TO CLEAR QUARTZ AND CARBONATE UNCONSOLIDED
GRAINS; MODERATELY SORTEDTO POORLY SORTED; SUB ANGULAR TO SUB ROUNDED AND
OCCASIONALLY POLISHED; INTERBEDDED WITH BLACK SHALEY LIMESTONE; NO VISIBLE
FLUORESCENCE OR CUT; BIT CRUSHED SAMPLES CONTAMINATED WITH COATING
FROM OIL BASE MUD AND MUD ADDITIVES.
LOGGING GEOLOGIST(S): C. H. Friloux
3.
Date: 11/10/06 TEXAS CRUDE ENERGY, INC. Spud Date: 08/17/06
Rpt #: 89
2803 Buffalo Speedway, Houston, TX 77098 Ph - (713) 599-9900 : Fax - (713) 599-9910
DAILY DRILLING REPORT Days from Spud: 86
Well Name & No. : Sugar Loaf #1 API Number : 42-355-31544 Approved AFE Cost : $6,022,072
Prospect/Field (V-#) : Sugar Loaf (V-1994A) County / State : Karnes County, TX Daily Well Cost : $89,218
Depth: 18,624' Footage : 148' Mud Wt. : 15.1 ppg Ave. ROP: 7 fph Proposed TD : 21,000' Total Spent to Date : $7,785,115
Contractor / Rig : Patterson #30 Wellsite Supervisor : Ron Bridges Running AFE Cost : $4,757,483
Formation : 40% Sandstone, 60% Calcareous Limestone Over / -Under AFE : 63.6% $3,027,632
Max Gas : 316 U Ave Gas : 193 U Trip Gas : 0 U Conn. Gas : 0 U Last Casing : 7-5/8" set to 16,998 '
Present Operation : Drlg @ 18624' w/ turbine
Casing Run OD (in.) Wt & Grade Depth
Depth 18,622' Conductor 9" 60 '
Mud Weight ( ppg ) 15.1 ppg Surface 13-3/8" 68# J55/N80 6,500 ' # OD (in.) ID (in.) Wt./ft Grade # of Jts Length
Flowline Temperature (oF) 149 deg F Protection 9-5/8" .5#HCL80/ECP1 14,480 ' 1 5" 4.276" 19.50# S135 358 11,206.80'
FV, sec/qt @Temp 83.0 Prot / Prod. 7-5/8" 39# P110EC 16,998 ' 2 4" 3.340" 14.00# S135 198 6,083.01'
PV, cp @ Temp 38.0 Prod / Liner 3 Kelly dn 46.00'
YP ( lbs/100 ft2 ) 8.0 14
Gels ( lbs/100 ft2 ) 5 6-1/2"
API WL ( cc/30 min. ) 0.0 Manfacturer - Model STC-KP703BPX # OD ID # of Jts Length
HTHP WL ( cc/30 min. ) 3.4 Type - IADC M842 4 4-3/4" 2.750" Jar 1 29.98'
Cake API / HTHP ( /32 ) 3 /32 Serial Number JW6602 5 4" 2.750" x 38 1,151.15'
Solids ( % ) 32 % Jets ( /32 ) 6/18 6
Water / Oil ( % ) 9 % 60 % Depth In ( ft. ) 18,177 ' 7 4-3/4" 2.813" non mag 1 12.28'
Sand ( % ) 0 % Depth Out ( ft ) 8 4-3/4" 2.813" non mag 1 30.51'
Low Gravity Solids ( % ) 6.2 % Cumulative Footage 447'
LCM ( ppb ) 0.0 Cumulative Hours 68.5
Methylene Blue Test (ppb) 0 Average Bit ROP 7 fph
pH @ Temp 0.0 5-7'
Alk. Mud (Pm) 0.0 RPM 55+1100' pony DC, X-Over, 27 jts 4" HWDP, 4 3/4" Smith jars,
Alk. Filtr (pf/mf) 0 --11 jts 4" HWDP, 198 jts 4" 14# FH DP, X-over, 5" 19.5# DP w/ 4 1/2 IF con
Chlorides (mg/l) 0 16.0 ppg 305 1,284.51 '
Hardness - Calcium (mg/l) 0 No.1 No.2 rental 190-210
Electrical Stability 1157.0 PZ 11 PZ 11 44 345
Volume - Hole / Pit ( Bbl ) 1,062 Bbl 870 Bbl 5.0" 5.0" 335 325
Mud in Storage ( Bbl ) 990 Bbl 11" 11"
Barite on Site (Sks) 2,700 Sks 67 179
Mud Company / Engineer Spirit Disharoon GPM 95% 179 0 # Hole Size AV ( fpm)
Mud Cost - Daily / Cumul. $9,416 $1,000,751 3,300 1 5" 6-1/2" 254
25/750 50/2100 2 4" 6-1/2" 167
Remarks: 3 ---
4 4-3/4" 6-1/2" 222
5 4" 6-1/2" 167
Depth Angle Azimuth Vert. Section TVD North/-South East / -West Dogleg 6 ---
18,365' 7.30 340.10 621.93 18318.89 431.28 -386.36 0.81 7 4-3/4" 6-1/2" 222
18,272' 7.70 335.20 609.79 18226.68 419.86 -382.23 2.16 8 4-3/4" 6-1/2" 222
18,162' 9.80 327.80 593.05 18117.96 404.67 -375.21 5.16
18,041' 15.70 318.30 566.35 17999.95 382.07 -360.98 4.34
17,947' 18.20 329.40 538.94 17910.03 361.61 -342.75 0.44 17.5 ppg Date: 10/20/06
17,852' 18.10 328.10 509.35 17819.76 336.14 -327.68 0.54
17,759' 18.60 328.10 480.07 17731.49 311.28 -312.21 1.30
17,666' 19.60 330.20 449.64 17643.61 285.45 -296.13 2.01
17,574' 19.40 324.70 418.93 17556.88 258.80 -280.87 1.39
17,450' 18.13 328.33 379.04 17439.48 226.24 -257.82 8.39
Survey Tool : Mud Motor: Bend (Deg.) : 0 09/18/06
Reported Accidents NONE
in the Last 24 Hrs :
Date Accident Report Sent to Texas Crude:
Fuel Used - Last 24 Hrs ( Gal. ) : 1,157
Rig Manager : Sam Garner / Alex Hernadez
Miscellaneous
Last Casing Shoe Test (ppg equiv.) :
Date of Last BOP Test : 10/19/06
DC / HWDP OD ( in.) :
DC / HWDP OD ( in.) :
DC / HWDP OD ( in.) :
Jet / Nozzle Velocity (fps) :
Directional / Inclination Surveys DC / HWDP OD ( in.) :
Last 10 Surveys are listed below starting with the last survey taken DC / HWDP OD ( in.) :
Mud
Remarks:
DP OD ( in.) :
DP OD ( in.) :
Pressure (psig)
Slow Pump Press / Rate
DP OD ( in.) :
SPM
Hydraulics
Circ. Flow Rate (GPM) :
Liner Size
Wt of BHA in Air ( M# ) : Pick Up Wt ( M# ) :
Stroke
Rotating Weight ( M# ) : Slack Off Wt ( M# ) :
Pump Data
BHA Rotating Hours : Total BHA Length :
Make / Model
Last BHA Inspection Date : Torque ( Ft-Lb ) :
Average WOB ( M# ) 6 1/2" - 1/16" IB stab w/ float, (1) 4 3/4" Non mag DC, (1) 4 3/4" x 12' non mag
Dull Grade ( T-B-G )
Equiv. Circ. Density ( ppg ):
Slick or Spiral
Bottom Hole Assembly Description
6 1/2" STC-KP703TBPXC impregnated bit, 5" turbine assm. (w/ 3 built in
6 7/16" stabs w/ top stab @ 1.2', 12.0', 32.5' and IB @ 55.6')
Size (in.) Drill Collars and Heavy Weight Drill Pipe
Jt. Description 465 jts 5" 19.5# w/ 4 1/2 IF+1 jt 5" 25# for test jt + 51 jts from yard (10
Mud Record Drill String and Bottom Hole Assembly
Drill Pipe
Bit Record -Bit # ===>
Start Time Stop Time Hrs
6:00 9:00 3.00
9:00 9:30 0.50
9:30 13:30 4.00
13:30 16:00 2.50
16:00 18:00 2.00
18:00 6:00 12.00
------------------
Total Hours 24.00 21.00 0.00 0.00 67.00Daily Rotating Hours: Daily Down Time: Contractor DT Today/Cumulative:
Drlg w/ turbine f/ 18530' - 18542' = 6.0 fph
Drlg w/ turbine f/ 18542' - 18624' = 6.8 fph
Drlg w/ turbine f/ 18476' - 18499' = 7.6 fph
Rig Service
Drlg w/ turbine f/ 18499' - 18530' = 7.7 fph
WL Survey @ 18457' = 7.1 deg @ 324.7 deg Az, survey gas = 316 units
Last 24 Hours Activity
Summary of Operations
General Remarks and Additions
TCEI Form DR-1 - 8/2006 MAH
-