The estimated operating costs for the Gullewa concentrator, including
administration, is A$48.81 per tonne of ore processed for oxide and transitional
material and A$37.53 per tonne of ore for primary material. This is based on mill
throughout of 250 000 tonnes per annum.
If thats all it cost to process 90,000ounce stockpile than they are going to make sh*t loads. No funding required
The total capital cost is estimated at $15.3M, comprising $13.8M for the
processing plant and infrastructure, and $1.5M for mine development – with the
refurbishment of the existing crushing and milling circuit at Gullewa, the
proposed addition of a copper concentrator and the upgrade of the existing camp
from 40 to 86-person capacity representing the principal capital components.
Dont need to upgrade to 86 person camp 40 will do if you are only processing ore. No $1.5million for mine development either.
Looking better the more i read. Hope im on the right track