JMS 3.45% 14.0¢ jupiter mines limited.

enter price, page-74

  1. 2,725 Posts.
    re: more thoughts re rio what is the difference between the anno of a couple days ago and the treatment of brockman deposit in the annual report?

    and why say:

    The project is located adjacent to Rio
    Tinto Limited’s Brockman No 3 Iron Ore Deposit.
    Surveying and surface sampling has confirmed that Jupiter’s Brockman Iron Project contains a hematite zone
    over 4km long and at least 300m wide. Rio Tinto’s Brockman 2 Iron Ore Mine averages 150m thick.

    and not use the thickness of rio's brockman no.3 (since it is next door?)
 
watchlist Created with Sketch. Add JMS (ASX) to my watchlist
(20min delay)
Last
14.0¢
Change
-0.005(3.45%)
Mkt cap ! $284.3M
Open High Low Value Volume
15.0¢ 15.0¢ 14.0¢ $315.6K 2.194M

Buyers (Bids)

No. Vol. Price($)
25 3794895 14.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 681373 4
View Market Depth
Last trade - 16.10pm 28/01/2025 (20 minute delay) ?
JMS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.