"SMS ranks the applied chemical processing method used as best-in-class, not only in terms of CAPEX and OPEX but also in terms of scalability and operational flexibility, demonstrating that the commercial production of this high-value material is a viable option for the TNG. TNG considers the ability to produce commercial grade vanadium electrolyte from its own vanadium pentoxide as a very positive development, allowing full vertical integration of its production pipeline as well as the ability to enter the fast-growing Vanadium Redox Battery (VRB) alternative energy sector. When combined with its existing capability to produce FerroVanadium from the technology provided by its off-taker partner WOOJIN, TNG is now well placed to supply every vanadium market."
and
"TNG is in discussions with a number of potential Vanadium Redox Battery producers and will update the market on the progress of these discussions and the potential development of a VE plant in the near future. TNG and SMS will now evaluate the feasibility of the construction of a VE production facility integrated with the TIVAN™ plant. This would allow TNG entry into the local growing Australian and nearby SE-Asian VRB sector as a regional electrolyte supplier."
also
"Further refinements;
Locking these improvements into the design of the overall process flowsheet has also opened up the potential for further refinements, which SMS and TNG have agreed to pursue. One of these key areas is the potential, subject to current and proposed confirmatory work, to produce a feedstock which is tailored for an industry standard fluidised bed chlorinator, allowing TNG to use an existing industry standard pigment plant design for its titanium dioxide pigment production, providing the potential for additional savings in capital expenditure while potentially producing highest purity pigment. As a result of the outstanding success of this work, TNG and SMS have agreed to undertake further optimisation of the titanium dioxide feedstock characteristics. Related testwork will be carried out in Perth and Vienna. TNG expects these enhancements to have a further material effect on the economics of the Mount Peake Project. After all improvements have been locked into the process flowsheet, a revised Financial Model may be prepared by Snowden incorporating the revised OPEX and CAPEX and production figures and the results will be reported."
GLTAH
- Forums
- ASX - By Stock
- TVN
- Ann: Quarterly Activities Report-TNG.AX
Ann: Quarterly Activities Report-TNG.AX, page-4
-
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $82.87M |
Open | High | Low | Value | Volume |
4.6¢ | 4.8¢ | 4.6¢ | $52.66K | 1.119M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 328723 | 4.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 328723 | 0.047 |
2 | 65000 | 0.046 |
11 | 993698 | 0.045 |
1 | 227295 | 0.044 |
1 | 13000 | 0.043 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 100000 | 1 |
0.050 | 6713708 | 8 |
0.053 | 147612 | 1 |
0.059 | 423800 | 1 |
0.060 | 549 | 1 |
Last trade - 16.10pm 08/10/2024 (20 minute delay) ? |
Featured News
TVN (ASX) Chart |