To use a mining analogy, Ceto 6 is entering the construction stage, with the production stage about to commence in 2018.
Using the same analogy, micro grid projects are similarly placed.
Solar energy and battery storage, well it is already in production but is expanding.
All up, things have never looked better and I think the market is showing that.
http://www.miningglobal.com/operations/1196/GIFS-The-5-Stages-of-the-Mining-Life-Cycle