PLS 1.37% $2.88 pilbara minerals limited

West Australian Article, page-82

  1. 3,294 Posts.
    lightbulb Created with Sketch. 421
    Acknowledging the more experienced in mining here discussing freight options.
    My assumptions up further on this thread were not to be interpreted as a bias to rail or road but simply to highlight some possible ball park cost differences from my own experience. The additional $1.0 per ton if loaded rail stock departs Pilbara rather than a spur is simply to highlight that once loaded the small additional 20 KM is not proportionately increasing the carriage rates.

    I am a little surprised we are discussing this, for a year a ago I was under the impression that this was not to be an issue and we could easily utilise rail freight. It seems some misunderstandings from posts back then?
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.