snippet frpm latest qtrly report released tonight
1.2 Production December Quarter
For half of the quarter, production was sourced from an older leach vat established by the previous project owners. A new leach vat was commissioned in mid October followed by a second one in November, bringing the total fresh oxides under leach to 13,000 tonnes of ore, at an estimated head grade of
5% Cu. Copper production during the quarter almost doubledthe previous quarter to 118 tonnes (63 tonnes in the September quarter). Sales revenue for the quarter was $716,000, excluding GST ($445,000 excluding GST n the September quarter).