Well #2-29 expected to peak at or above the field average 75mcfg = .075mmcfg/d At this rate it would take around 36 years per well to produce 1 BCF of gas, not including decline rates. Except the wells would probarbly cut out long before this.
Envy , not on these numbers.
- Forums
- ASX - By Stock
- RFE
- cash flow positive
cash flow positive, page-6
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)