RWD 18.5% 3.2¢ reward minerals ltd

Ann: Quarterly Activities Report, page-9

  1. 630 Posts.
    lightbulb Created with Sketch. 1
    The key operational metrics for the LD project are:

    Trench flow rates
    Sustainability of flow rate
    Potash concentration

    These have been answered in the current quarterly.

    The other operational matters:

    Pond Design and construction
    Plant design
    Transport
    are in hand as with the EIS.

    Seems that the project can now attract high calibre personnel to drive to completion.
 
watchlist Created with Sketch. Add RWD (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.