DVP 1.92% $2.04 develop global limited

Ann: Sulphur Springs Value Engineering Study, page-36

  1. 2,430 Posts.
    lightbulb Created with Sketch. 40
    1. http://www.venturexresources.com/wp...04-ASX-Release-Pilbara-Optimisation-Study.pdf

    Screen Shot 2017-02-17 at 1.27.57 PM.png

    2. http://www.venturexresources.com/wp-content/uploads/2017/02/170216-VES-Complete.pdf
    Mining Proposal Approval Received For Pilbara Project
    http://www.asx.com.au/asxpdf/20140313/pdf/42nbszpy7g5vnq.pdf

    Screen Shot 2017-02-17 at 1.41.17 PM.png

    3. Their copper price assumption only looked 8% higher than current prices. While the zinc price assumption is ~12% under current prices. The assumptions are in no way aggressive.

    4. I thought NPV8% is standard in the industry? It shows how solid the economics are even with such a high discount rate.

    Very interesting to note how all your questions highlight how solid and cheap VXR is at these levels.

    I might have to buy even more.
 
watchlist Created with Sketch. Add DVP (ASX) to my watchlist
(20min delay)
Last
$2.04
Change
-0.040(1.92%)
Mkt cap ! $526.4M
Open High Low Value Volume
$2.05 $2.08 $2.00 $924.4K 453.5K

Buyers (Bids)

No. Vol. Price($)
1 10000 $2.02
 

Sellers (Offers)

Price($) Vol. No.
$2.07 9353 2
View Market Depth
Last trade - 16.10pm 19/07/2024 (20 minute delay) ?
DVP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.