Maryborough Basin - Queensland
The Burrum-2 well, the second of the two coal seam gas well program in ATP 613P in the Maryborough Basin of southeast Queensland, spudded on 8 March. The wells are designed to evaluate the coal seam potential of the previously unexplored Burrum Coal Measures in the northern portion of the Burrum Syncline. At 06:00 hrs on 14 March Burrum-2 was at a depth of 390 metres. Several coal seams have been intersected and sampled for desorption analysis.
Eureka Petroleum, a wholly-owned subsidiary of Energy Investments Limited, is funding 100% of a two-staged coal seam gas exploration program, in return for which it will be assigned a 90% working interest in the Burrum Syncline farmin area. Stage 1 comprises the current two-well program. Magellan has the right to back-in to retain up to a 50% participating interest in any development by matching Eureka’s prior expenditures.
Burrum-2 Details:
Petroleum Title: ATP 613P Queensland
Location: Approximately 2 km northeast of the township of Howard and approximately 55 km north of the city of Maryborough
Coordinates: MGA 94 56457785E 7200350S
JV Operator: Magellan Petroleum Corporation
Drilling Rig: Depco Rig 22 - UDR 1200
Proposed Total Depth: 600 metres
Objectives: Coals of the Burrum Coal Measures
Operations for period: Burrum-2 spudded on 4 March 2007 and was drilled in open hole to a depth of 115 m. The well was then fully cored and at 06:00 hrs on 14 March was at a depth of 390 m.
Progress for Period: 390 metres.
Participants in Burrum-2 are:
Magellan Petroleum Corporation (Operator) 10%
Energy Investments Limited 90%
- Forums
- ASX - By Stock
- EIV
- weekly drilling report
EIV
energy investments limited
weekly drilling report
Featured News
Add EIV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online