RMX 0.00% 0.1¢ red mountain mining limited

Lead time for drilling permits BLM, page-40

  1. 2,702 Posts.
    lightbulb Created with Sketch. 440
    I've been looking at the placer claims and one of them has moved north of the original claim. As anyone will know, updating a claim is like going to the back of the queue and so i think this is the answer to the why it's taking so long. @The Architect wondering if you're seeing what i am in the that one of the sites now is sitting further up\ the valley ?
 
watchlist Created with Sketch. Add RMX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.