Drilling Status Report – 13 April 2007
• Paradox Basin #1 oil & gas well, Grand County, Utah, is at 15,397 feet
(4,692 m) in the Pennsylvanian Molas Formation, at the top of the
well’s primary objective.
• A cement bond log has been completed to hole bottom with satisfactory
results. The well is expected to drill on into the objective Leadville
Limestone within 24 hours.
PARADOX BASIN #1 OIL & GAS WELL, UTAH USA
Golden State Resources is pleased to announce that operations at the Paradox Basin #1 oil &
gas well are proceeding satisfactorily.
A cement bond log was today completed successfully to the well bottom.
Preparations are in progress to run in the hole with a drilling assembly and drill on, within the
next 24 hours, into the major objective Leadville Limestone.
Paradox Basin #1 is at 15,397 feet (4,692 m), in the Pennsylvanian Molas Formation, a
distinctive terra rossa palaeosol horizon formed on the top of the Leadville Limestone, the
primary objective of the well.
- Forums
- ASX - By Stock
- GDN
- annoucement out
annoucement out, page-19
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GDN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online