SGQ 6.25% 2.6¢ st george mining limited

Ann: Drilling Success Continues at Mt Alexander, page-29

  1. 7,197 Posts.
    lightbulb Created with Sketch. 164
    Maybe consider TLM's Sinclair project. It is the closest project to Mount Alexander I believe. They have all the goods for mining, but no nickel deposits. It is only 100 kms away and would mean very cheap start up costs for SGQ to start mining. Here is the info.

    The Sinclair Nickel Project includes extensive new-near infrastructure including an existing open-cut and underground mine, an on-site 300,000tpa Concentrator, sealed airstrip and +200-person accommodation village.
    The process plant and mine were placed on care and maintenance in August 2013 and have been maintained to a very high standard.
    Key infrastructure associated with the Sinclair Nickel Project includes:
    • Open pit, decline and underground mine;
    • Processing, crushing and screening plant;
    • Nickel concentrate plant;
    • Run-of-Mine (“ROM”) pad;
    • Waste dump and topsoil stockpiles;
    • Tailings storage facility;
    • 200-person accommodation village and facilities;
    • Administration buildings;
    • Fully-equipped maintenance and stores warehouse;
    • Core yard and exploration offices;
    • Borefield and pipelines;
    • Mining contractor facilities;
    • Reverse osmosis plant and potable water pipelines; and
    • Waste-water treatment plant.
 
watchlist Created with Sketch. Add SGQ (ASX) to my watchlist
(20min delay)
Last
2.6¢
Change
0.002(6.25%)
Mkt cap ! $25.20M
Open High Low Value Volume
2.4¢ 2.6¢ 2.4¢ $50.84K 1.996M

Buyers (Bids)

No. Vol. Price($)
1 751317 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 6000 1
View Market Depth
Last trade - 15.44pm 28/06/2024 (20 minute delay) ?
SGQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.