Sure it does. Pre drill results when was unconfirmed what was there MC = 25m x 28c = 7m , post drill results for those forward looking MC = 60m x 28c = 16.8m. And if you want to do it on an EV basis it was 2.5m vs 9-10m. Basically a 4 times increase in value for the resource.
TMT Price at posting:
29.0¢ Sentiment: Hold Disclosure: Not Held