Well look; 150mt, mining license granted , mining proposal just about there, FEED -'front end engineering and design' about completed, EPC contractor ready to roll, Camp installed on site and just about to be commissioned , long lead time plant already procured , $80m in the bank and MC tag of 425m hanging around its neck at present.
MIN already have near 10%....alliance / JV member sucks up another 10% at cheap as chips prices. 10% + 10% = 20% = takeover mechanism triggered , outside director seated and flip a cheap takeover offer in front of shareholders that have been through the ringer.
We'll I'd find it near rude not to offer if i was in the position.
Just a scenario ... no doubt a few will arrise , but near 90m traded over teh last few days ...hmmm, maybe ask @mustpow
Pokerface, page-101
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
|
|||||
Last
$2.99 |
Change
0.010(0.34%) |
Mkt cap ! $9.000B |
Open | High | Low | Value | Volume |
$2.93 | $3.01 | $2.89 | $104.7M | 35.12M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 11874 | $2.98 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.99 | 65336 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5944 | 2.980 |
4 | 23697 | 2.970 |
4 | 2326 | 2.960 |
4 | 16176 | 2.950 |
4 | 26405 | 2.940 |
Price($) | Vol. | No. |
---|---|---|
3.000 | 33244 | 8 |
3.010 | 24535 | 9 |
3.020 | 32584 | 9 |
3.030 | 72673 | 8 |
3.040 | 80177 | 10 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |