DKO dakota minerals limited

Ann: Sepeda - Drill Results & Metallurgical Testwork Update, page-6

  1. 35,472 Posts.
    lightbulb Created with Sketch. 2863
    I think he is saying "as well as".

    because this is the main work to come in 4 weeks. Chemical Grade

    "Next Metallurgical Test Work Steps: • Precipitation of Li2CO3; first test complete, results pending • Purification by bicarbonation • Preparation of LiOH The precipitation of Li2CO3 and preparation of LiOH are the final steps in Dakota’s sighter metallurgical study with Dorfner-Anzaplan, to demonstrate that petalite material from Sepeda can produce both a technical grade and a chemical grade lithium product via conventional, commercially tested methods. As outlined above, a final report with full details of the hydro-metallurgical test work is scheduled for completion at the end of May 2017."
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.