From the quarterly:
The campaign is anticipated to be a circa 25 day drill program. Precise timing is dependent on weather, and quality of access to the other two drill locations. Conditions continue to improve however Utah has experienced an unusually high rainfall and late snowfall which has impacted some areas in terms of access for heavy equipment.
The drill will take as long as it takes, there's no control over this. At least they are drilling and first hole now done.
- Forums
- ASX - By Stock
- RMX
- Ann: Red Valley Drilling Update
Ann: Red Valley Drilling Update, page-5
- There are more pages in this discussion • 344 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RMX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $3.424M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1.177K | 1.176M |
Featured News
RMX (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online