10th September 2003
JINGEMIA 2
PERTH BASIN, WESTERN AUSTRALIA
UPDATE
Norwest Energy NL advises that the wireline logs are presently being run to further
evaluate the Jingemia 2 appraisal.
Total Depth: 2,781 metres
Depth at time of last release: 2,739 metres
Progress: 42 metres
Current Operation: Conducting wireline logging programme
Proposed next 24 hours: Continue running wireline logs
Well commenced drilling: 24th August 2003
Objective Dongara Sandstone
Objective Drilled Depth about 2,663 meters
Objective Vertical Depth about 2,414 metres
Objective Intersected 2,699 metres
The Jingemia 2 appraisal well is being drilled from the Jingemia 1 production facility at
high angle to target the Dongara Sandstone oil reservoir approximately 1 kilometre
southeast of the number discovery well. As mapped, the well is designed to intersect the
edge of the Jingemia Oil Field. Jingemia 2 will better define this field oil and determine
the oil-water contact for the field. Drilling of this appraisal well will, therefore give greater
confidence to field reserves and provide a point for water injection into the reservoir to
provide pressure support.
Norwest Energy NL has a 1.278% interest in this well and the Jingemia Oil Field.
- Forums
- ASX - By Stock
- HDR
- jingemia 2 update
HDR
hardman resources limited
jingemia 2 update
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)