88E 0.00% 0.2¢ 88 energy limited

Ann: Icewine 2 - Operations Update, page-13

  1. 17,185 Posts.
    lightbulb Created with Sketch. 600
    i wonder if this paragraph will make people a tad nervous,

    During cementing of the 4.5” production liner, hole conditions in the Pebble Shale Unit (beneath the HRZ production interval) prevented successful completion. The liner was retrieved to surface and will undergo minor repair whilst the hole is reconditioned to minimize the chance of recurrence. Post repair the liner will be run back in the hole and re-cemented.

    all the best to everyone,
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $1.42K 705.9K

Buyers (Bids)

No. Vol. Price($)
217 215248169 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 592228052 205
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.