KPO 8.33% 1.1¢ kalina power limited

KPO Chart Thread, page-335

  1. 315 Posts.
    Mechanical completion for Sinopec plant is due for completion in July. I hope they can meet this target.

    To what extent do folks think ROW deals depend on the finalization of Hainan? The tech has been used in other plants around the world, don't these builds already showcase the benefits of the infrastructure?

    Has anyone sourced feedback from Sinopec (ie not attributed to Sinopec in a kalina ann) re their impressions on the tech. I'm conscious there have been delays and construction issues. KAlina tends to casually brushes them aside in their reporting, but I'm keen to know how the customer views the situation
 
watchlist Created with Sketch. Add KPO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.