TGS 0.00% 4.9¢ tiger resources limited

Ann: March 2017 Quarterly Activities Report, page-107

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 892 Posts.
    lightbulb Created with Sketch. 13
    For users who always like to blame management for everything:

    Overview

    KIPOI copper project is located in the copper rich Katanga province of the DRC,approximately 75km North West of the town of Lubumbashi.
    The first phase of the Kipoi project has been designed to process approximately 3.5Mtpa of copper-bearing ore and to produce 25 000Ktpa of LME Grade A copper cathode.
    SENET was awarded the LSTK contract for the design, construction and commissioning of the process plant and its related support infrastructure.
    The process route was defined by experienced SENET process engineers in conjunction with MMS, a specialist Australian consultancy with many years of Solvent Extraction and Electrowinning experience.
    The plant design and layout were developed by SENET engineers and designers, and comprise the civil, structural, mechanical, electrical and instrumentation aspects of the project.
    In addition, SENET was wholly responsible for the construction, logistics and management of the project.​

    http://www.senet.co.za/projects/central-southern-africa/kipoi/
 
watchlist Created with Sketch. Add TGS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.