Just off the top of my head
Pond 1......30bbls/day (already there)
Pond 2 and 3....470bbls/day
Current production is 85bbls/d and rising, so they are required install at least Pond 2. This would also take care of Gin Gin West which was previously 50bbls/day. We await the test results of GGW-1 (will probably depend on the pressure differential between the two wells).Hell that test was nearly a month ago and still stum.
Toppy, Monumental it could be. Don't forget they appear to have fracked-up the Upper D Sands and are going back to try and fix it up.
EGO Price at posting:
15.5¢ Sentiment: Hold Disclosure: Held