We now have confirmation of near surface mineralisation and an extension of depth from the 6 twin drill holes to historical holes. A total of 438 metres of drilling completed out of the planned 5000 metres in area 1 over a target area 1.8km by 1km. Use 75 metres as a depth and we still have another 60 odd holes to complete in area 1 to extend mineralisation
Then onto area 3 for another 5000 metres of drilling over an area of 5km by 2km
All of which is on just one (1) of their leases