Heres page 1 This is very impressive. They have kept on a drill or 2 to explore the new targets but already I reckon my Million Ounces is safe.
TAMPIA HIGH GRADE GOLD CONTINUOUS OVER 900m AND AT DEPTH
Highlights
• Shallow, high grade gold mineralisation at Tampia now continuous over 900m strike length and 350m down dip (approximately 180m below surface); remaining open at depth.
• New results received from the Leicester (southern) gold zone include significant intercepts of: THRC157 7m at 20.55 g/t Au from 135m (incl. 2m at 67.45 g/t from 135m),
THRC166 3m at 3.62 g/t Au from 35m,
THRC177 6m at 5.30 g/t Au from 63m (incl. 1m at 27.20 g/t from 63m),
THRC178 3m at 2.16 g/t Au from 50m; 11m at 4.84 g/t Au from 67m (incl. 2m
at 12.18 g/t from 67m); 3m at 5.00 g/t Au from 89m, and 3m at 3.19
g/t Au from 115m,
THRC180 4m at 8.89 g/t Au from 5m (incl. 1m at 26.50 g/t from 6m) and 8m
at 4.13 g/t Au from 70m,
THRC184 5m at 1.16 g/t Au from 83m,
THRC187 10m at 5.32 g/t Au from 86m (incl. 1m at 32.60 g/t from 90m),
THRC188 1m at 24.70 g/t Au from 27m and 1m at 15.90 g/t Au from 126m,
THRC189 4m at 5.19 g/t Au from 129m,
THRC193 7m at 5.82 g/t Au from 112m (incl. 1m at 18.95 g/t from 116m),
THRC195 15m at 1.26 g/t Au from 104m,
THRC213 4m at 5.27 g/t Au from 16m (incl. 1m at 17.30 g/t from 17m).
•Gold mineralisation confirmed to continue for 200m down dip of the northern (Wanjalonar) high grade gold zone, with results including: THRC196 3m at 12.65 g/t Au from 57m (incl. 1m at 35.70 g/t from 58m),
THRC198 6m at 1.39 g/t Au from 70m,
THRC226 9m at 2.10 g/t Au from 107m.
•First gold mineralisation confirmed from the Merino gold zone, with results including: THRC210 1m at 14.55 g/t Au from 12m,
THRC224 1m at 8.84 g/t Au from 28m,
•Excellent continuity (and therefore predictability) of high grade mineralisation has been a feature of drilling to date in both the Leicester and Wanjalonar gold zones, with additional high-grade gold mineralisation continuing to be intersected in both zones;
•173 RC holes have been completed for 23,408m to date. These assay results from 60 drill holes are in addition to the 56 holes reported previously (12 April 17 and 5 May 17), with the next round of assays (57 RC holes) pending.
•Drilling of the remaining 9,160m (program expanded to 32,568m due to the