going even further... all that is needed is then if success in ICE4 =the FarWest vertical into HRZ/stacked conventional, a followup horiztonal just to show it flows as needed...
and then, these production setups with the first batch being 4 or 5 horizontals plus gas injector (eg;ICE5, ICE6, ICE7, ICE8 at least...), can be repeated on new pads along the highway... if of course the sweetspot material is there...
Hartleys has different $$$per Acres ranges dependent on stage of the project...
for Pilot testing it has like 7,500 USD/acre and for Production Well drilling it has like 10,000 USD/acre,
so one can see where this is all leading too...
not full out production, but enough to create as much value as possible as quick as possible...
obviously all of this goes back to ICE2...
ICE2 needs to be successful, otherwise the whole game shifts to the Conventional only... (effectively)...
and obviously this is the point in time that we are now at, which is probably the most pivotal in the entire project )))
[if anything in the above is incorrect or u think wrongly interpreted, then feel free to correct it ]
- Forums
- ASX - By Stock
- 88E
- the "new" pad...
the "new" pad..., page-2
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add 88E (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(25.0%) |
Mkt cap ! $43.40M |
Open | High | Low | Value | Volume |
0.2¢ | 0.2¢ | 0.2¢ | $46.48K | 23.26M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
474 | 1305395133 | 0.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.2¢ | 23140122 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
471 | 1281195133 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.002 | 23140122 | 3 |
0.003 | 512385035 | 217 |
0.004 | 160217141 | 104 |
0.005 | 61008289 | 50 |
0.006 | 35001656 | 35 |
Last trade - 15.57pm 17/09/2024 (20 minute delay) ? |
Featured News
88E (ASX) Chart |