MMB magma metals limited

ann.further nickel mineralisation intersected

  1. 2,045 Posts.
    KEY POINTS

    Assays confirm strike potential of thick nickel zone.
    Further results pending from sulphide intersections over a strike length
    of 900m.
    Potential for large-tonnage Ni-Cu deposit.
    An eight hole 1,089m reverse circulation (RC) drilling program has been completed at the
    Green Dam prospect in the Roe project, 120km east of Kalgoorlie (Figures 1 and 2). The
    program was designed to follow up results of previous reconnaissance drilling which
    confirmed a nickel-copper sulphide zone over a strike length of 700m near the basal contact
    of the Green Dam mafic-ultramafic complex (Figure 2).
    Assays from the third drill hole in this program, YRC014, have been received and indicate an
    intersection of 24m at 0.42% Ni & 0.13% Cu from 115m, including 14m @ 0.55% Ni &
    0.16% Cu. The 14m interval contained three separate 1m intercepts of 1.5% Ni & 0.42%
    Cu, 1.34% Ni & 0.30% Cu and 1.08% Ni & 0.31% Cu (Table 1).
    This hole was drilled approximately 40m along strike to the south-east of drill-holes YRC009
    and the deeper YRC013 (Figure 2), which intersected 16m @ 0.74% Ni & 0.37% Cu from
    145m and 45m @ 0.60% Ni & 0.23% Cu from 162m, respectively (Table 1). These
    intercepts indicate that mineralisation appears to be thickening with depth in this area.
    An intersection of 8m @ 0.62% Ni & 0.36% Cu from 146m was recorded in the historic drillhole
    YRC005 approximately 40m along strike to the southeast of drill-hole YRC014.
    These drilling results confirm the continuity of a thick zone of Ni-Cu mineralisation over at
    least 80m of strike. Other thick drill intercepts of Ni-Cu mineralisation recorded elsewhere at
    the prospect (Figure 2), together with those reported here, indicate potential for a hightonnage
    Ni-Cu deposit at Green Dam.
    Several zones of disseminated and massive sulphides have been logged in the other drillholes
    in the recently completed program in the south-eastern and north-western parts of the
    prospect. These extend the zone of sulphide mineralisation to approximately 900m in strike
    length. The remaining assay results should be available within the next two weeks.
    1
    Table 1. Green Dam Prospect – RC Drill Intersections
    (Results for intercepts are reported at the cut-off grades shown in right-hand column; these may include some 1m
    intervals at less than the cut-off grade shown)
    Drill
    Hole
    Easting
    (m)
    Northing
    (m)
    Azimuth
    (Degs)
    Dip
    (Degs)
    Depth
    (m)
    From
    (m)
    To
    (m)
    Intercept
    (m)
    Ni
    (%)
    Cu
    (%)
    Ni %
    Cutoff
    YRC014 472861 6620973 20 -60 162 115 139 24 0.42 0.13 0.2
    including 117 131 14 0.55 0.16 0.3
    and 117 118 1 1.50 0.42 1.0
    and 127 128 1 1.34 0.30 1.0
    and 130 131 1 1.08 0.31 1.0
    Previously announced drill intersections:
    YRC009 472823 6620986 20 -60 172 145 161 16 0.74 0.37 0.3
    including 145 147 2 2.20 1.41 1.0
    YRC013 472814 6620954 20 -60 225 162 207 45 0.60 0.23 0.2
    including 163 184 21 0.81 0.29 0.3
    including 167 169 2 2.04 0.20 1.0
    and 197 198 1 2.61 0.68 1.0
    and 203 204 1 1.08 0.37 1.0
    Historic drill intersection:
    YRC005 472887 6620967 35 -60 162 146 154 8 0.62 0.36 0.3
    A substantial drilling program is planned at the prospect to determine the potential for a
    large-tonnage deposit.
    Magma Metals Limited holds a 100% interest in the tenement over the Green Dam prospect.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.