New Annual compliance report available: https://sarigbasis.pir.sa.gov.au/WebtopEw/ws/samref/sarig1/image/DDD/MCR1478229.pdf
Some quotes I found interesting:
"The original optimised open pit design captured 355,000 tonnes of the Inferred Resource containing 53,200 oz of gold." (page 1)
"Within an extended LoM, it is planned that up to approximately 14 million cubic metres of overburden would be removed and up to approximately 1 million tonnes of gold bearing materials would be mined and processed." (page 1)
Further resource definition drilling is planned and will likely be ongoing throughout the life of the mine. There remains potential for further pit extensions dependent on drilling and assay results and further mine feasibility studies. (page 2)
Guess there's a bit of gold still down there.
- Forums
- ASX - By Stock
- HAV
- Ann: Portia Gold Mine Update - May 2017
Ann: Portia Gold Mine Update - May 2017, page-7
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HAV (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $56.99M |
Open | High | Low | Value | Volume |
19.0¢ | 19.0¢ | 17.5¢ | $38.28K | 213.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 48753 | 17.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
18.0¢ | 77972 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 48753 | 0.175 |
6 | 111588 | 0.170 |
4 | 110784 | 0.165 |
4 | 150250 | 0.160 |
1 | 20000 | 0.155 |
Price($) | Vol. | No. |
---|---|---|
0.180 | 77972 | 1 |
0.190 | 20000 | 1 |
0.200 | 5000 | 1 |
0.250 | 2610 | 1 |
0.260 | 4100 | 1 |
Last trade - 14.39pm 13/09/2024 (20 minute delay) ? |
Featured News
HAV (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online