88E 25.0% 0.3¢ 88 energy limited

Ann: Operations Update, page-421

  1. 563 Posts.
    Hi Ya

    I have limited knowledge of shale drilling but I know that fluid will flow better horizontally than vertically due to layering. So my question is if there is no vertical flow could a horizontal attempt be successful or are they likely not to proceed with that given no vertical flow?

    Thanks
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.001(25.0%)
Mkt cap ! $72.33M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $5.009K 2.249M

Buyers (Bids)

No. Vol. Price($)
47 96266624 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 600926597 231
View Market Depth
Last trade - 15.56pm 23/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.