What they need to do is to dig 2 trenches in parallel in each location, one to 2.7m and one to 5.5m and test the flow in each. This will allow them to determine the flow rates in the lower half 2.7m to 5.5m which has lower specific yield. They should really do this in all locations imo as it will allow them to better optimise their trench network design.
- Forums
- ASX - By Stock
- AMN
- Ann: Construction of Pilot Trenches Underway
AMN
agrimin limited
Add to My Watchlist
5.00%
!
9.5¢

Ann: Construction of Pilot Trenches Underway, page-2
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
9.5¢ |
Change
-0.005(5.00%) |
Mkt cap ! $36.26M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.5¢ | $4.739K | 47.38K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 571 | 9.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 21270 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 571 | 0.095 |
1 | 25000 | 0.094 |
1 | 47809 | 0.093 |
1 | 50000 | 0.092 |
1 | 50000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 21270 | 2 |
0.105 | 25532 | 1 |
0.110 | 126746 | 1 |
0.115 | 107906 | 2 |
0.120 | 52059 | 3 |
Last trade - 12.14pm 25/07/2025 (20 minute delay) ? |
Featured News
AMN (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Frazer Bourchier, Director, President and CEO
Frazer Bourchier
Director, President and CEO
SPONSORED BY The Market Online