SP3 4.55% 2.1¢ spectur limited

Ann: Hardware Innovation Provides Greater Sales Potential, page-12

  1. 3,790 Posts.
    lightbulb Created with Sketch. 218
    Potential applications . Compared to the millions lost due to disruptions and enduring the wrath of delayed commuters, Spectur tech provide warning helping the Metro manage emergencies better .


    Train delays: Truck reportedly hits Flemington Road rail bridge


    Peak-hour train travellers faced lengthy delays after a truck reportedly hit a rail bridge in Melbourne's north on Monday.

    Police were told a truck hit the Flemington Road rail bridge on the Upfield line shortly after 5pm.


    Passengers leaving Macaulay station on Monday evening.
    Metro Trains said it was informed of a "bridge strike" by Victoria Police and sent engineers to inspect the damage.

    But there's no evidence of a truck ever hitting the Flemington Road bridge.

    "There was no truck there when we arrived," a Metro spokesman said.

    Similarly, police said there was no truck in sight when officers arrived at the scene.

    Nevertheless, trains were stopped and hundreds of passengers forced to find other means of transport.

    One commuter described scenes at nearby Macaulay station as "absolute chaos".

    Engineers declared the bridge safe about 5.40pm, but it was too late for commuters already facing half-hour delays.
 
watchlist Created with Sketch. Add SP3 (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
-0.001(4.55%)
Mkt cap ! $5.617M
Open High Low Value Volume
2.1¢ 2.1¢ 2.1¢ $2.1K 100K

Buyers (Bids)

No. Vol. Price($)
1 294547 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 41700 1
View Market Depth
Last trade - 14.30pm 26/07/2024 (20 minute delay) ?
SP3 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.