'How many ounces do we think will be added from this section alone?'
Resource at Klondyke of 374k oz defined over 2km, so 187k oz per km. The 'gap' is reported by the company to be 700m long, but looks to be 550-600m if the long section is correct. All else being equal, 700m of strike should be good for 130k oz so a total resource of about 500k oz. Given that the current resource estimate is likely to partly impinge on the gap already and the fact that the gap looks a little shorter than reported by the company, I'd bank on adding about 100k oz.
- Forums
- ASX - By Stock
- CAI
- Research Report - 4.3c target (short term)
Research Report - 4.3c target (short term), page-3
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CAI (ASX) to my watchlist
(20min delay)
|
|||||
Last
11.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $93.67M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CAI (ASX) Chart |
Day chart unavailable