CKA 0.00% 8.1¢ cokal limited

Ann: Barging Commences and Initial Valuation Confirms Viability, page-203

  1. 12,121 Posts.
    lightbulb Created with Sketch. 1484
    Originally 6 -> 8 months. Not a lot to construct. Port is biggest item. Construct in Surabaya An Barge to site. Easy peasy ! Meanwhile Port earthworks and foundations are prepared. Road construction longest duration as about 50 km if I remember correctly. Will follow timber roads I think.
    Mine preparations and pre-stripping by contractor. All mining Infrastructure by mining contractor.
 
watchlist Created with Sketch. Add CKA (ASX) to my watchlist
(20min delay)
Last
8.1¢
Change
0.000(0.00%)
Mkt cap ! $87.39M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 128999 8.1¢
 

Sellers (Offers)

Price($) Vol. No.
9.1¢ 307055 1
View Market Depth
Last trade - 16.12pm 09/08/2024 (20 minute delay) ?
CKA (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.