88E 0.00% 0.2¢ 88 energy limited

Ann: Operations Update, page-236

  1. 2,711 Posts.
    lightbulb Created with Sketch. 236
    LSE was in frenzy overnight - people getting excited. Some very good posts - worth a read.
    2H?
    Mud for drilling or plugging?
    Flow rates?

    My sense is that the company is rushing through the conventional (Plan B) in an attempt to generate interest before the IW2 results are announced in order to keep the venture alive.

    Or they are super-confident the results from IW2 are outstanding and funding for delineation will be a given.

    Hoping for the later - but gut feel tells me we are heading for Plan B.

    I hope we get an Ann covering the forward plan and intentions soon.
    Last edited by Bert333: 27/08/17
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.