LOM strip ratio is 3:1 , i.e 4 tonnes of earth movement for every one tonne of spod ore. Hence 8Mt contract for 2Mt plant feed.
2 year contract says to me we are aiming to have stage 2 commissioned by mid 2020 and be pumping out 5m tonnes. If MACA have performed well in their first two years they likely get the extension plus the expansion to 20Mt/a of material movement (that's a lot of trucks) assuming they can handle the capacity.
If their performance is not up to scratch I suspect we just get someone new in to take over the contracts from the time Stage 2 comes online.
- Forums
- ASX - By Stock
- PLS
- Ann: Award of Mining Contract
Ann: Award of Mining Contract, page-46
-
- There are more pages in this discussion • 24 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.10 |
Change
0.050(1.64%) |
Mkt cap ! $9.335B |
Open | High | Low | Value | Volume |
$3.21 | $3.26 | $3.08 | $87.12M | 27.65M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
8 | 195050 | $3.10 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.12 | 1000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 190000 | 3.100 |
9 | 245155 | 3.090 |
8 | 202328 | 3.080 |
5 | 25000 | 3.070 |
9 | 57846 | 3.060 |
Price($) | Vol. | No. |
---|---|---|
3.120 | 1000 | 1 |
3.130 | 3300 | 1 |
3.140 | 11100 | 3 |
3.150 | 292553 | 6 |
3.160 | 182053 | 6 |
Last trade - 16.10pm 07/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
NEWS
Exciting new copper-gold discoveries at Tarraji-Yampi: Dive into the strong drilling results now
PLS (ASX) Chart |